A 70 bedroom independent hotel decided to review all aspects of their energy consumption. – more info
A manufacturing business initially intended to replace their existing heating boiler. – more info
A large engineering business operating from factory buildings originally constructed in the 1960s incurred substantial costs attempting to heat the areas for their workforce. – more info

A major vegetable producer was being encouraged by the supermarket group it supplies to "go green" – more info
Targeted with reducing their energy costs, the client approached us for assistance. – more info
Committed to reducing their carbon emissions and increasing their sustainability, the client had unsuccessfully trialled a number of products intended to reduce energy consumption across their extensive care home estate. – more info